ff
Technical implementation of CNTA’s new laboratory building in San Adrián, a 3,000 m² extension spread over two floors and designed to strengthen the center’s scientific and technological capabilities.
HibLab Solutions has designed, developed, and carried out the renovation project of several laboratories in the Interprofesional Lechero de Cantabria building.
The design, sizing and execution of the comprehensive refurbishment of the new laboratory spaces at the Nestlé Production Center in La Penilla de Cayón (Cantabria) has meant a great change in the interior architecture.